Which ADU Is Right for Your Property?

Florida homeowners build four main types of ADU. Whether a given type is allowed depends on your local zoning — here's what each costs, how long it takes, and which fits your lot.

Detached Backyard Cottage
Most Popular

Detached Backyard Cottage

Size

400–1,000 sq ft

Cost

$150,000–$280,000

Timeline

8–18 months

Best For

Large lots with rear yard space

Pros

  • + Maximum rental income
  • + Separate entrance
  • + Full privacy

Cons

  • - Requires rear setbacks
  • - Most expensive option
Garage Conversion
Fastest & Most Affordable

Garage Conversion

Size

300–600 sq ft

Cost

$50,000–$120,000

Timeline

3–7 months

Best For

Homeowners with underutilised attached or detached garage

Pros

  • + Existing foundation and walls
  • + Fastest permit approval

Cons

  • - Lose garage space
  • - Size limited by existing structure
Attached Addition
Multigenerational

Attached Addition

Size

300–800 sq ft

Cost

$90,000–$200,000

Timeline

6–12 months

Best For

Multigenerational living, aging parents, adult children

Pros

  • + Shared utilities reduce costs
  • + Feels connected

Cons

  • - Less privacy
  • - Requires structural integration
Modular / Prefab ADU
Fixed Price & Fast

Modular / Prefab ADU

Size

400–800 sq ft

Cost

$129,000–$200,000 installed

Timeline

12–26 weeks from order

Best For

Speed, predictable costs, simple flat lots

Pros

  • + Fast installation (10 days on site)
  • + Hurricane-rated
  • + Fixed price

Cons

  • - Less customisation
  • - Delivery logistics required

Find out which ADU type is allowed on your specific property

Enter your Florida address for a free zoning eligibility check in 30 seconds.

Tip: This runs best with the full street address + city + ZIP.

Browse Florida ADU Builders by City

Connect with vetted, licensed ADU builders in your area.