Which ADU Is Right for Your Property?

Four types of ADUs are permitted in Florida. Here's what each costs, how long it takes, and which is right for your lot.

Detached Backyard Cottage
Most Popular

Detached Backyard Cottage

Size

400–1,000 sq ft

Cost

$150,000–$280,000

Timeline

8–18 months

Best For

Large lots with rear yard space

Pros

  • + Maximum rental income
  • + Separate entrance
  • + Full privacy

Cons

  • - Requires rear setbacks
  • - Most expensive option
Garage Conversion
Fastest & Most Affordable

Garage Conversion

Size

300–600 sq ft

Cost

$50,000–$120,000

Timeline

3–7 months

Best For

Homeowners with underutilised attached or detached garage

Pros

  • + Existing foundation and walls
  • + Fastest permit approval

Cons

  • - Lose garage space
  • - Size limited by existing structure
Attached Addition
Multigenerational

Attached Addition

Size

300–800 sq ft

Cost

$90,000–$200,000

Timeline

6–12 months

Best For

Multigenerational living, aging parents, adult children

Pros

  • + Shared utilities reduce costs
  • + Feels connected

Cons

  • - Less privacy
  • - Requires structural integration
Modular / Prefab ADU
Fixed Price & Fast

Modular / Prefab ADU

Size

400–800 sq ft

Cost

$129,000–$200,000 installed

Timeline

12–26 weeks from order

Best For

Speed, predictable costs, simple flat lots

Pros

  • + Fast installation (10 days on site)
  • + Hurricane-rated
  • + Fixed price

Cons

  • - Less customisation
  • - Delivery logistics required

Find out which ADU type is allowed on your specific property

Enter your Florida address for a free zoning eligibility check in 30 seconds.

Tip: This runs best with the full street address + city + ZIP.

Browse Florida ADU Builders by City

Connect with vetted, licensed ADU builders in your area.