What ADU can you build in your Orange Park backyard?
Instant zoning report — see exactly what your zoning allows: permitted ADU types, size limits, setbacks, and lot requirements for your specific property.
The quick answer
Orange Park ADU rules at a glance
- Owner-occupancy
Not required — you can rent both units - Short-term rentals
Allowed with local licensing — verify with the city - Where it's allowed
Eligibility varies by zoning district — check your address to confirm yours

ADU Rules in Orange Park, Florida
We've researched Orange Park's ADU rules so you don't have to. Here's what matters most — the facts that determine whether your project is possible, and how much it will cost.
- Stable military/suburban LTR market — NAS Jacksonville drives consistent demand from E-4 through officer ranks
- Most of 'Orange Park' is unincorporated Clay County — confirm jurisdiction before submitting permits
- No owner-occupancy requirement under local zoning rules
- HOA communities are common — check CC&Rs before any planning
- LTR income $950–$1,600/month; STR minimal in this market
Last verified: 2026-04-02

Backyard ADUs like this are being built across Orange Park — here's how to do it right.
What Orange Park's zoning may allow for an ADU
Orange Park ADU rules. Clay County's largest community and Jacksonville's most established western suburb. Military community (NAS Jacksonville 10 miles north). Clay County connector active.
Zoning allowance
ADUs permitted on eligible single-family parcels under local zoning rules. Note: Orange Park is an incorporated town, but most of the area marketed as 'Orange Park' is unincorporated Clay County — confirm jurisdiction with Clay County Property Appraiser.
Size limits
ADU size limits are set by local zoning — confirm the maximum with the city.
Lot + setbacks
Typical setbacks: 7.5ft side, 10ft rear. Many Orange Park/Clay County parcels are suburban lots 75–100ft wide with good buildable space for detached ADUs.
Height + coverage
Maximum 30–35ft in residential zones.
Parking
One parking space required for ADU.
Rental / occupancy
Owner-occupancy not required under local zoning rules. LTR-dominant market driven by military personnel from NAS Jacksonville and Jacksonville corporate demand.
Permit process
Clay County Utility Authority and Building Department for most parcels (most of Orange Park is unincorporated). Town of Orange Park Building for parcels within town limits (smaller area).
Building limits and rental rules, side by side
These figures are based on the best available data for Orange Park and should be confirmed with the city's planning department before you commit to a design or a rental strategy — local ordinances change and vary by parcel.
Building Limits
- Max Size:See requirements above
- Setbacks:7ft side / 10ft rear
- Detached Allowed?Yes
- Max Height:35 ft
- Build Cost Est.:$100,000–$195,000
Rental Rules
No Owner-Occupancy Requirement: Both units can be rented to tenants simultaneously.
Short-Term Rentals: Not prohibited at the city level. State DBPR license required.
Estimated Monthly Income
$950–$1,600/month
Based on 2025–2026 Orange Park market data
ADUs are NOT Permitted In:
- HOA communities with ADU prohibitions in CC&Rs
- Commercial zones along US-17 and Blanding Boulevard
- Wetland and flood buffer areas near Black Creek and Doctors Lake
Here's exactly what you'll pay — and how to avoid the fees that catch most homeowners off guard
Most homeowners spend 3–4 weeks piecing this together on their own. We've mapped the full Orange Park permit process step by step — so you know exactly what's coming, and what to prepare.
Step 1: Pre-Application Zoning Check
- Where:
- Clay County Planning and Zoning, 477 Houston Street, Green Cove Springs, FL 32043
- Contact:
- (904) 269-6300
- What to bring:
- Property address and parcel ID, preliminary site sketch, lot survey
- Timeline:
- No appointment fee — call ahead to confirm office hours
- Cost:
- No fee for initial inquiry
Step 2: Submit Permit Application
- Where:
- https://www.claycountygov.com/departments/planning/building
- Contact:
- (904) 269-6300
- What to bring:
- Architectural plans, site plan, boundary survey, energy compliance docs
- Timeline:
- 5–9 weeks plan review; 7–12 weeks total
- Cost:
- $6,550–$15,100 in permits and fees (excluding construction)
Step 3: Plan Review & Revisions
- Where:
- Clay County Planning and Zoning
- Contact:
- (904) 269-6300
- What to bring:
- Responses to any correction letters; revised drawings if required
- Timeline:
- 5–9 weeks plan review; 7–12 weeks total
- Cost:
- No additional fee for standard resubmittal
Step 4: Construction & Inspections
- Where:
- Orange Park Building Department
- Contact:
- (904) 269-6300
- What to bring:
- Approved permit set must be on-site at all times during construction
- Timeline:
- Schedule inspections as each phase of work is completed
- Cost:
- Included in permit fee
Full Orange Park Permit Cost Breakdown
These are the fees you'll encounter, in the order you'll typically encounter them.
| Cost Item | Amount / Notes |
|---|---|
| Total Estimated Cost | $6,550–$15,100 in permits and fees (excluding construction) |
| Building Permit Fee | $1,200–$2,800 |
| Impact Fees | $4,000–$9,000 |
| Plan Review Fee | $350–$800 |
| Utility Connection Fees | $1,000–$2,500 |
Key ADU Restrictions in Orange Park
These are the rules that most often catch homeowners by surprise. Read them carefully before engaging an architect.
- Most of what's called 'Orange Park' is unincorporated Clay County — confirm jurisdiction before contacting the Town of Orange Park building department
- HOA communities are common throughout Clay County's planned neighborhoods (Oakleaf Plantation, Fleming Island) — check CC&Rs before planning
- Clay County has a mixed permit workload — review times can vary; plan for potential 6–10 week review periods
Common Mistakes to Avoid in Orange Park
- NAS Jacksonville BAH (Basic Allowance for Housing) drives a reliable LTR market for E-4 through O-3 ranks — ADUs priced at $950–$1,400/month fill quickly with military tenants
- Fleming Island (south of Orange Park in Clay County) is a more affluent sub-market with higher rents and newer construction — worth considering for a premium ADU build
- Orange Park area has mostly flat terrain and shallow water tables — drainage planning is important for ADU foundations, especially in older neighborhoods
Eligible Zones in Orange Park
ADUs may be permitted in these zoning districts, but eligibility depends on your specific parcel and the current local ordinance. Confirm your parcel and rules with Orange Park Planning before relying on this — most homeowners can check their zone at the county GIS portal in a few minutes.
Orange Park neighborhoods where ADU permits are being filed — is your street next?
Orange Park ADU — Frequently Asked Questions
These are the questions we hear most often from Orange Park homeowners. If yours isn't here, our ADU Zoning Experts can answer it directly.
Is Orange Park's rental market strong enough to justify an ADU build?
Orange Park offers reliable, stable rental income rather than high yields. The military tenant base from NAS Jacksonville (15,000+ personnel) creates structural demand for quality rental housing in the $950–$1,400/month range. Orange Park Medical Center and the growth of the Clay County school system also drive healthcare and teacher demand. If your goal is low-risk, low-vacancy LTR income, Orange Park delivers. If you're targeting STR yields, this is not the market.
Orange Park Planning Department
We recommend calling Clay County Planning and Zoning at (904) 269-6300 before submitting anything — a 10-minute conversation can save weeks of back-and-forth on your permit application.
Clay County Planning and Zoning
Nearby Cities — ADU Rules
Get your free Orange Park ADU Guide
Your personal zoning report + complete Orange Park ADU requirements — delivered free to your email in 60 seconds.
No spam. Unsubscribe anytime. Used by 10,000+ Florida homeowners.
Serving homeowners in 32073, 32065 and surrounding Orange Park zip codes.
This page provides general information based on current ordinances and publicly available data as of April 2026. Zoning rules change — verify all requirements with your local planning department before making financial commitments.