What ADU can you build in your Cocoa backyard?

Instant zoning report — see exactly what your zoning allows: permitted ADU types, size limits, setbacks, and lot requirements for your specific property.

Free report · No commitment · 60 seconds

The quick answer

Cocoa ADU rules at a glance

  • Owner-occupancy
    Not required — you can rent both units
  • Short-term rentals
    Allowed with local licensing — verify with the city
  • Where it's allowed
    Eligibility varies by zoning district — check your address to confirm yours
Modern backyard ADU in Cocoa, Florida

ADU Rules in Cocoa, Florida

We've researched Cocoa's ADU rules so you don't have to. Here's what matters most — the facts that determine whether your project is possible, and how much it will cost.

  • The City of Cocoa has no accessory dwelling unit ordinance
  • Accessory living quarters are prohibited in residential districts
  • Do not confuse with Cocoa Beach, which has its own separate rules

Last verified: 2026-07-15

Florida homeowners proudly pointing at their completed backyard ADU in Cocoa — the result of a successful build

Backyard ADUs like this are being built across Cocoa — here's how to do it right.

What Cocoa's zoning may allow for an ADU

The City of Cocoa does not have an accessory dwelling unit ordinance. Accessory living quarters are barred in its residential districts (a narrow on-site employee-housing exception aside), so a rentable independent ADU is not a permitted use.

Zoning allowance

Cocoa's zoning code does not provide for accessory dwelling units in residential districts; accessory living quarters are prohibited there except for a limited on-site employee-housing case (Land Development Code, Art. XIII §6).

Size limits

No ADU is permitted, so there is no ADU size allowance.

Lot + setbacks

Setbacks, lot coverage, and minimum lot size for an accessory dwelling vary by zoning district. Confirm the exact figures with the city's planning department.

Height + coverage

Height and lot-coverage limits vary by zoning district. Confirm current limits with local planning.

Parking

Parking requirements for an accessory dwelling vary by district; typically one additional space. Confirm with local planning.

Rental / occupancy

A rentable accessory dwelling is not permitted in residential districts.

Permit process

An accessory dwelling is permitted through the city's standard zoning-review and building-permit process. Contact the local planning or building department for current requirements.

Building limits and rental rules, side by side

These figures are based on the best available data for Cocoa and should be confirmed with the city's planning department before you commit to a design or a rental strategy — local ordinances change and vary by parcel.

Building Limits

  • Max Size:See requirements above
  • Detached Allowed?Check with city

Rental Rules

Short-term rental rules vary — confirm with Cocoa Planning.

ADU rules in Florida are set locally. Whether Cocoa allows an ADU—and at what size, setbacks, parking and occupancy terms—depends on the applicable local zoning ordinance. Florida Statute §163.31771 allows local governments to adopt ADU ordinances but does not create a universal statewide right to build an ADU on every residential property. Check your address to review the rules that may apply to your parcel. See the full Florida ADU laws guide →

Here's exactly what you'll pay — and how to avoid the fees that catch most homeowners off guard

Most homeowners spend 3–4 weeks piecing this together on their own. We've mapped the full Cocoa permit process step by step — so you know exactly what's coming, and what to prepare.

1

Step 1: Pre-Application Zoning Check

Where:
Cocoa Planning Department
What to bring:
Property address and parcel ID, preliminary site sketch, lot survey
Timeline:
No appointment fee — call ahead to confirm office hours
Cost:
No fee for initial inquiry
2

Step 2: Submit Permit Application

Where:
Cocoa Planning Department — contact for portal link
What to bring:
Architectural plans, site plan, boundary survey, energy compliance docs
Timeline:
Contact planning to confirm current review timelines
Cost:
Contact planning for current fee schedule
3

Step 3: Plan Review & Revisions

Where:
Cocoa Planning Department
What to bring:
Responses to any correction letters; revised drawings if required
Timeline:
Plan for one or more review cycles — timeline varies by submission completeness
Cost:
No additional fee for standard resubmittal
4

Step 4: Construction & Inspections

Where:
Cocoa Building Department
What to bring:
Approved permit set must be on-site at all times during construction
Timeline:
Schedule inspections as each phase of work is completed
Cost:
Included in permit fee
Aerial view of a Florida residential neighborhood — properties where homeowners are adding ADUs

Cocoa neighborhoods where ADU permits are being filed — is your street next?

Cocoa ADU — Frequently Asked Questions

These are the questions we hear most often from Cocoa homeowners. If yours isn't here, our ADU Zoning Experts can answer it directly.

Can I build an ADU in Cocoa, Florida?

Cocoa's zoning code does not provide for accessory dwelling units in residential districts; accessory living quarters are prohibited there except for a limited on-site employee-housing case (Land Development Code, Art. XIII §6).

What is the maximum ADU size in Cocoa?

No ADU is permitted, so there is no ADU size allowance.

Do I need to be an owner-occupant to build an ADU in Cocoa?

A rentable accessory dwelling is not permitted in residential districts.

Can I use my Cocoa ADU as an Airbnb?

Contact Cocoa Planning to confirm current short-term rental rules for ADUs.

How do I get an ADU permit in Cocoa?

An accessory dwelling is permitted through the city's standard zoning-review and building-permit process. Contact the local planning or building department for current requirements.

Get your free Cocoa ADU Guide

Your personal zoning report + complete Cocoa ADU requirements — delivered free to your email in 60 seconds.

No spam. Unsubscribe anytime. Used by 10,000+ Florida homeowners.

This page provides general information based on current ordinances and publicly available data as of 2026-07-15. Zoning rules change — verify all requirements with your local planning department before making financial commitments.